The following is my assessment of the project:
That when developing the project care was never taken to read carefully the set objectives and whether or not they were being met. As a result only two of them were met which indicated there was a need to overhaul the system. None the less expansion continued as if nothing was wrong.
Modern development tools like prototyping were never used properly. System users were never involved in the development as the project was only handled by the experts. As a result serious mistakes were never detected let alone being solved in time.

The size of the project needed the use of modern networking hardware, fast enough to cope with the heavy traffic created by the over 650,000 users. Instead of replacing the obsolete old hardware with the new ones the project continued to build on them which created more disaster.
The monitoring process was never put into use as the Navy personnel who appeared to have vested interest in the project kept on defending it rather than bringing correcting and useful comments during the development process. They only focused on being able to provide some service whether that service was reliable or dependable was never the issue was never an issue.
The Navy system is normally classified as critical and needs special methods  to minimize and tolerate some faults during its development. Such methods were never used. For example reliability, safety and security assessments were never done.
Performance tests were never carried even though it was clearly known such tests were mandatory. The programming languages used were never compatible with modern  distributed operating systems. There was need to use Object Oriented Systems to enhance later modification compatibility
THE AFI NEW SYSTEM PROPOSAL
Introduction
Purpose of the Document
This document is prepared for use by the following people and for the following purposes:
User Name
Why need the Document
System Customers
Check if needs are met and specify any changes that may be required
Managers/ Officers
To plan for the system bid and its development
System Engineers
To Know and be guided on what system to develop
System test engineers
To develop validation tests
System Maintenance Engineers
To understand the system parts and its totality
Scope of the Product
This system is meant to be used by the current air force staff and it will take into account their current number and the projected number in the year 2030..
It will use the most current network technology including their topologies, transmission media, and distributed operating system architecture.
System Overview
Why use networks
To allow for efficient sharing and use of computer resources
To facilitate efficient dissemination of messages, notices to air force staff
To provide connectivity to other armed forces and air force personnel in US
To research and read widely about events taking place in US, and outside world. In particular those that are a threat to the US
To perform trade and other commercial activities
The connectivity and expected workload
Ethernet products will be used due to its simplicity and widespread use
Fiber optics cables will provide major connectivity
Wireless hone technology will be used
Expected Achievements and Failures
All the cited failures in the NMCI project will be avoided, specifically:
The integrated system life cycle will be used which is proper fact finding, system design, system implementation through prototyping, system integration and testing; system parallel operation, evaluation and maintenance.
User involvement at all levels of system development
User training through in house training programs; seminars and workshop attendance
System Constraints
The major constraint will be lack of awareness on the part of users . Computer technology is changing very rapidly and the organization will be properly informed and well prepared to accept such changes as inevitable.
Methods and Procedures
Network Models Used
System Anticipated Evolutions
Recommendations
Conclusions
References:
Internet as given from NMCI system namely:
http://www.gao.gov/new.items/d0751.pdf
http://www.govexec.com/dailyfed/1206/120806ts1.htm
http://www.eds.com/news/news.asp?news_id=2905
Ian Summerville : Software Engineering

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our Guarantees

Money-back Guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism Guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision Policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy Policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation Guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more