Advice for Sub-Contracting Arragements: Issues with BIM and Procurement

Advice Report:

Summary: This report is to provide professional advice for DA Construction discussing sub-contracting arrangements and the issues which arise when BIM and Procurement are paired.

 

 

 

 

 

Contents…

Introduction

 

Pg.5

Sub-contracting

 

Pg.6

Partnering

 

Pg.7

Supply-chain management

Pg.8

Conclusion

Pg.9

References

 

Pg.10

Introduction

The framework agreement that DA Construction have just entered in to has many projects whereby Birmingham City Council is the client. As part of the first call-off there must be consideration to how the company can improve their performance and achieve a long-term relationship. This advice is based on sub-contracting, partnering and supply-chain management and how each aspect can benefit DA Construction and the client.

Sub-contracting

Due to the framework agreement DA Construction have taken on they must appoint roles for their selected sub-contractors to ensure the work is done on time and to the standard required.

The sub-contractors may be specialised in certain areas for example one of the sub-contractors to be specialised in Cladding systems. This is more in relation to Nominated sub-contracting whereby DA Construction will appoint the sub-contractor and they carry out a part of the contract. This differs from other types of sub-contractors as the Client (Birmingham City Council) will have influence on selection of the nominated sub-contractor. This form of sub-contracting is permitted when a prime cost sum is entered in a bill of quantities- the client will negotiate a price with the nominated subbie and then allows the main contractor to appoint the works. The contractor and the architect must also agree to a specified subcontractor to carry out part of the work and due to time constraints the materials must be ordered early. There are benefits associated for both the client and sub-contractor using the route of nominating sub-contractors. The client is able to select the specialist contractor it wants/prefers, achieve the design the desire and have valuable engineering input, also allows the client to have direct access during the progress of works. The sub-contractor benefits by having much greater certainty of payment.

Named sub-contracting (domestic sub-contracting) is an alternative option to nominated subcontracting where the contractual relationship is less complex (Design Buildings Wiki, 2018). Unlike nominated, the main contractor has the liability of the construction works which is considered a more favourable approach to the client as there is accountability associated. How it works is there is a list of acceptable sub-contractors provided by the client which are then invited to tender, the client then short-lists the acceptable ones these are put in the tender documents in the main construction contract. The performance of the sub-contractors is the responsibility of DA construction and in which they are also paid by you as the main contractor.

Certain criteria should be put in place when selecting sub-contractors, preferably the contractor will want sub-contractors based on past performance, suitable experience, track record of competitive pricing and financial stability. Birmingham City Council may have a pre-determined list of subcontractors who have been part of projects before who they consider to be trusting. The insurance policies are highlighted in criteria selection as well as the cost and time priority. These factors of the project will contribute to the overall success of the project. On public sector projects such as these in question, a sub-contract for which the client intends to nominate, may be subject to the requirements of the OJEU Procurement Rules however these are subject to changes due to Brexit.

Overall, With the nominated approach the owner is given the authority to select the sub-contractor at any time, even long after the main contract has been entered to. 

In such contracts there is a possibility of cost claims by the Main contractor if there is delay from nominated sub-contractors, but this rarely happens because the contact is between the nominated and the main contractor. Nominated also allows the client can make comparison among the subcontractor and choose the most suitable one to take over the specialist work.

Partnering

There is need for modern methods of procurement stems from the inability of procurement routes to meet all the needs of the employer. The best option would be Partnering for this framework. Partnering is used for collaborative management and openness between parties making them become dependent on each other to be constructive, (Constructing Excellence, 2015). It is a co-operative approach to managing a contract through teamwork with an Open book approach. Resulting in a reduction in litigation and time/cost overruns, payment without delay to all parties and cost savings of which up to 25% has been achieved.

 A framework is defined as “An agreement between one or more contracting authorities which establishes the terms under which the economic operator will enter into one or more contracts with a contracting authority in the period during which the framework agreement applies” (UK Public Procurement Regulations, 2015). This agreement is not a contract, it is the arrangement of the Birmingham City Councils projects whereby contractors will input there tender. These individual projects are known as call-offs which are carried out in different forms of contract basis. Due to the projects being under the council they’re considered public works therefore the most common contract would be NEC for this these types of projects.

As you are procuring on a long-term basis, a framework can deliver many benefits, such as reduced transaction costs, continuous improvement throughout and achievement of better value. There is also Improvements in environmental performance and greater sustainability resulting in a reduction of environmental impact. This agreement ensures performance monitoring where the predictability of cost and time design of the construction is overseen. There is also opportunity for response from clients to say how satisfied they’re with the projects, this is used as a scale of 1-10. As Birmingham City University is continuously commissioning construction work, they may want to reduce procurement timescales and other risks such as health and safety risks. Using a framework agreement allows the Council to invite tenders from suppliers of goods/services to be carried out over a period of time on a call-off basis as and when required. The diagram illustrates how a framework with 2 or more agreements is broken down between projects. Each project called-off under the agreement has its own contract.

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our Guarantees

Money-back Guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism Guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision Policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy Policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation Guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more