principles of management

  
Case: Louis Vuitton
Louis Vuitton was founded in 1854 and opened its first workshop in 1860 in the Paris suburb of Asnières. Work at Asnières is still done by hand, and many current models are closely based on the original designs that made Vuitton a fashion icon. Workers specialize in making certain types of bags, and 20 to 30 craftsmen can take up to 8 days to complete one tote! That level of precision and care has been encouraged to maintain the traditional appeal of the brand.
Maintaining that caché involves creating high demand, frequent use of limited-edition products, and suppressing supply levels on their standard product lines. Vuitton sells its luggage at prices from roughly $2,000 to $4,000 per piece and has never put its products on sale. In the 1970s, the single factory in Asnières could not meet the increased demands of globalization, so Vuitton began adding new factories every other year. As a result of major pushes in marketing, store-opening, and expansion into the U.S. and Japan, Vuitton experienced annual sales increases from $760 million in 1990 to $3.7 billion in 2000.
Vuitton’s current production system, however, is slow and makes it difficult to adjust to increased demand when certain items become hot. In spite of new factories and production schedules, the production process itself still needed to change to keep up with demand. In 2005, Vuitton introduced its new Pegase plan, which was based on teamwork and production line models used by Japanese automakers. Previously under Vuitton’s production process, each task involved in making an item was done by a single craftsman, who would pass the item along to the next station after he had completed his task. 
Under Pegase, workers are divided into teams of 6 to 12 craftsmen, with each worker trained in several specific tasks. Tasks are divided so that each set takes about the same amount of time. Each team is given a single batch of items to work on, and their work stations are arranged in U-shaped clusters, eliminating the time it took to move items between workstations. Previously, it took 8 days to complete a single bag, like the Reade tote, but now it takes only one.  Furthermore, Vuitton can now get new batches into its boutiques in six weeks, half the time it used to take. Worker versatility makes it much easier to switch teams to new projects if an item becomes hot, and additional training has improved product troubleshooting as well. Customer returns at Vuitton’s Issoudun and Conde plants have dropped by two thirds since the new production system has been in place.
ANSWER THE FOLLOWING QUESTIONS:

Under      the old production system, it took 8 days to complete one tote bag. This      is a measure of?
With      improvements in troubleshooting, Vuitton has been able to reduce the      number of returns on handbags at two of its factories. This reduction in      the number of flaws in its products is an example of improvements in?
As      a result of insufficient production rates, customers were frequently being      put on long waiting lists. By increasing production capacity to meet      increased demand, Vuitton was attempting to achieve higher?
The      manufacturing process that best describes Vuitton’s old production methods      would be?
When      Vuitton made an assessment of its manufacturing process, it discovered      that items were often left sitting on carts waiting to be moved to the      next work station. In response, Vuitton eliminated separate work stations      and rearranged its factory floors into U-shaped clusters with adjacent      tables. Vuitton’s transition to a more efficient system demonstrates its      commitment to quality through?

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our Guarantees

Money-back Guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism Guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision Policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy Policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation Guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more