Calculation of Labour Utilization
Time used by assistant supervisors for production process = 100% -10% = 90% Therefore, the total available labour = 18 + 0. 9*4 = 21. 6 Maximum labour hours/ month = No. of days*labour hrs available/day*total available labour = 20*8*21. 6 = 3456 hrs Actual labour hours used = 1531. 7 hrs Capacity Utilization = Actual labour hours used/ Maximum labour hours available = (1531. 7/3456) * 100 = 44. 32% This figure does not include the time taken by labour to rework on the parts rejected or returned by the customer. Hence, the actual labour utilization would be more than the above-calculated figure. However, we believe that the above time signifies the actual time spent by labor in producing or working on new parts.
Profile operation (Fabrication) – Break-even analysis: Let the optimal order size be N boards

a) Using Punch Press: Total Operating Time = Setup time + Cycle Time*N = 50 + 1*N = 50 + N
b) Using CNC router: Operating Time = Setup time + Cycle time*N = 150 + 0. 5*N= 150 + 0. 5N We would use the CNC router when its operating time is less than that of the punch press. i. e. 150 + 0. *N ? 50 + N => 0. 5*N ? 100 => N ? 200 => N ? 200 boards Thus, for orders above 200 boards, the CNC router should be used as it will take less time and hence, would produce more number of boards.

 Drilling Operation (Image Transfer) – Break Even Analysis Let the optimal order size be N boards

a) Using Manual drill: Total Operation Time = Setup time + Run time = 15 + 0. 08*500*N = 15 + 40N
b) Using CNC drill: Total Operation Time = Setup time + Run time = 240 + 0. 004*500*N = 240 + 2*N We would use the CNC drill when its operating time is less than that of the punch press. 240 + 2*N ? 15 + 40*N => 38*N ? 225 => N ? 5. 92 => N ? 6 boards

Therefore, for orders with size above 6 boards or more, CNC drill should be used as it will take less processing time and hence would increase the capacity. In addition to this, we can also calculate capacity utilization using the available run time. Thus the maximum number of boards that can be produced is limited by the capacity of drilling( which is 6359) inclusive of CNC as well as manual drilling.

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our Guarantees

Money-back Guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism Guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision Policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy Policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation Guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more