Chapter Ten – Project Scheduling: Lagging, Crashing, and Activity Networks

Discussion Questions 2, 3, 5 

Chapter 10: Additional Study Notes
(Excerpts from the original Pinto PowerPoint Presentations)
Gantt Charts 

Establish a time-phased network 
Can be used as a tracking tool 

Benefits of Gantt charts 

Easy to create and comprehend 
Identify the schedule baseline network 
Allow for updating and control 
Identify resource needs

Crashing 
The process of accelerating a project 
Principal methods for crashing 

Improving existing resources’ productivity 
Changing work methods 
Increasing the quantity of resources

Managerial Considerations 

Determine activity fixed and variable costs 
The crash point is the fully expedited activity 
Optimize time-cost tradeoffs 
Shorten activities on the critical path 
Cease crashing when – the target completion time is reached – the crashing cost exceeds the penalty cost

Controversies in the Use of Networks 

Networks can be too complex 
Poor network construction creates problems v Networks may be used inappropriately 
When employing subcontractors  

– The master network must be available to them 
– All sub-networks must use common methods 

Positive bias exists in PERT networksChapter 10: Additional Study Notes

(Excerpts from the original Pinto PowerPoint Presentations)
Gantt Charts 

Establish a time-phased network 
Can be used as a tracking tool 

Benefits of Gantt charts 

Easy to create and comprehend 
Identify the schedule baseline network 
Allow for updating and control 
Identify resource needs

Crashing 
The process of accelerating a project 
Principal methods for crashing 

Improving existing resources’ productivity 
Changing work methods 
Increasing the quantity of resources

Managerial Considerations 

Determine activity fixed and variable costs 
The crash point is the fully expedited activity 
Optimize time-cost tradeoffs 
Shorten activities on the critical path 
Cease crashing when – the target completion time is reached – the crashing cost exceeds the penalty cost

Discussion Questions 2, 3, 5 (from the textbook)
Questions:

Question- The advantage of Gantt chart lies in their linkage through the project schedule baseline. Explain this concept.

Question – What are the advantages in the use of Ganett charts over PERT diagrams? In what ways might PERT diagrams be advantageous?

Question -Under what circumstances might you wish to crash a project?
   
Controversies in the Use of Networks 

Networks can be too complex 
Poor network construction creates problems v Networks may be used inappropriately 
When employing subcontractors  

– The master network must be available to them 
– All sub-networks must use common methods 

Positive bias exists in PERT networks

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our Guarantees

Money-back Guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism Guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision Policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy Policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation Guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more